Health, Safety and Environment
project profile

Mine Best achievable Technology (BAT) Assessment Review

Integrated Sustainability - Industrial Water Treatment Services and Equipment
project details

Independent Review of Mine Water Treatment Technology Assessment for Regulatory Alignment

project overview

Integrated Sustainability was engaged to independently review a mine site’s Best Achievable Technologies (BAT) assessment. We tested the process and draft report against British Columbia (B.C.) guidance, clarified data gaps, and contributed to workshops to improve rigor, clarity, and regulatory alignment as subject matter experts.

project deliverables

  • Conducted a targeted review of water-related background documentation to contextualize site-specific conditions and identify information gaps relevant to Best Available Technology (BAT) development.
  • Evaluated the proposed BAT process for alignment with British Columbia BAT guidance, identifying potential discrepancies, missing regulatory linkages, and opportunities for refinement.
  • Performed a detailed technical review of the draft BAT documentation, providing tracked changes and commentary highlighting scientific, technical, and process-related strengths and weaknesses.
  • Contributed expert technical input during 3 virtual workshops focused on technology screening, feasibility assessment criteria, and Multi-Criteria Analysis (MCA) methodologies.
  • Prepared and submitted formal technical memoranda summarizing findings at each project stage to support documentation tracking, regulatory alignment, and knowledge transfer to the client team.
bg-cta

request a tailored
credentials pack

Please provide a brief explanation of your project requirements, and we will get back to you with a tailored credentials package ASAP.