Water Asset Delivery and Installation
project profile

Lithium Brine Extraction Advisory to Provincial Regulator

Integrated Sustainability - Industrial Water Treatment Services and Equipment
project details

Technical Advisory on Lithium Brine Extraction and Aquifer Risk for Provincial Policy Development

project overview

Integrated Sustainability delivered a comprehensive presentation to a provincial energy regulator on lithium brine extraction technologies, environmental considerations, and public safety implications. The presentation summarized current extraction technologies and examined environmental and aquifer risks associated with brine reinjection. By outlining technical, environmental, and logistical factors, the presentation supported informed decision-making for future policy and project planning.

project deliverables

  • Delivered a technology-focused presentation covering solvent-based, membrane, electrochemical, and ion exchange extraction methods.
  • Summarized operational requirements including pre-treatment needs, waste by-products, and equipment considerations for large-volume brine handling.
  • Characterized key environmental risks including emissions, power demand, chemical use, and solid waste generation.
  • Evaluated aquifer impacts related to brine reinjection, including interference with hydrocarbon zones and long-term disposal constraints.
  • Provided recommendations on data collection strategies to address geological and regulatory uncertainties.
  • Conducted a structured review of an external risk matrix and contributed advisory commentary to support internal gap assessment.
bg-cta

request a tailored
credentials pack

Please provide a brief explanation of your project requirements, and we will get back to you with a tailored credentials package ASAP.