Remote Water Treatment Facility Operations Programs
project profile

Operations & Maintenance for a Gold Mine Water Treatment Plant

Integrated Sustainability - Industrial Water Treatment Services and Equipment
project details

Mine Water Treatment Operations for a Moving Bed Biofilm Reactor (MBBR) System

project overview

Integrated Sustainability assumed full operational responsibility 5 months into operation of a water treatment plant. The team focused on optimizing operation systems, resolving outstanding commissioning work, and preparing the plant for care and maintenance operations. Priorities included optimizing performance of the MBBR system, developing tailored standard operating procedures, and implementing a reliable maintenance and reporting framework.

project deliverables

  • Completed on-site review and optimization of the MBBR system and supporting treatment infrastructure.
  • Prepared site-specific standard operating procedures and finalized safe operating procedures based on observed and documented practices.
  • Delivered a 12-month maintenance plan and spares forecast, along with a detailed gap analysis for critical parts and consumables.
  • Conducted an operations gap assessment and finalized the inventory list for transition-readiness.
  • Provided continuous engineering support to refine maintenance strategies and resolve technical challenges identified during the care and maintenance transition.
  • Developed site-specific data collection, calibration, and dosing adjustment procedures based on current system performance and site configuration.