Project Tag: Regulatory Services

Source Water Treatment & Pipeline Study

Changing regulatory requirements surrounding the use of fresh water for Steam Assisted Gravity Drainage (SAGD) heavy oil extraction resulted in the need for this study. Through it, Integrated Sustainability

Wastewater Management Strategy

Preliminary treatment system design, regulatory permitting and process identification, and capital/operational cost estimate analysis of preliminary design.

Fire Protection System Design

Complete a fire protection system plan for one of the largest crude oil rail loading facilities in North America. This was required to demonstrate to the local municipality that

Water Security Management Plan

Develop a Water Security Management Plan (WSMP) with the goal of ensuring available source(s) of water to support future operations. The WSMP was also tasked with identifying suitable water

Mine Closure Planning Project

provide support to the mine Water Group in support of mine closure planning. Requested deliverables included: Closure planning for decommissioned or soon-to-be decommissioned facilities; Dedicated disposal areas monitoring and

Disposal Well Options Evaluation

Establish the most feasible economic option for a new disposal well between a choice of re-completing an existing well or drilling a new one.

Water Reuse Strategy Evaluation

Reduce the operational costs for trucking and disposal of frac flowback and produced water by reusing as much as possible during future completions.

Download Content

Please complete this short form to access the content.