The Challenge
Complete a fire protection system plan for one of the largest crude oil rail loading facilities in North America. This was required to demonstrate to the local municipality that fire protection had been adequately considered at the front end engineering design stage of the project.
The Result
A Fire Protection Plan was created that combined loss of containment prevention and control, fire hazard mitigation, and fire suppression and cooling. The design was reviewed and approved by the local municipality.