Water Intake, Water Treatment Plant & Storage Infrastructure
Development of a river water intake (10,000 m3/d), water storage tanks, (5,000 m3/day) treatment facility, and 200,000 m3 saline water storage ponds
Development of a river water intake (10,000 m3/d), water storage tanks, (5,000 m3/day) treatment facility, and 200,000 m3 saline water storage ponds
Design, Build, Finance, and Operation of a dedicated 4,000 m3/d water treatment facility for on-demand water recycle. Provided the design and operation of the facility with guaranteed performance to
Zero liquid discharge technology evaluation for wastewater treatment and central processing facility operational cost reduction.
Integrated Sustainability investigated opportunities to improve the management of waste at a gas processing facility in British Columbia in order to achieve operational cost savings. The team was also
The client had requested that Integrated Sustainability complete a Water Reuse Strategy Evaluation that provided a recommendation regarding a water treatment process and associated infrastructure including storage, treatment processes,
Designated process and water treatment support and process optimization and trouble-shooting at a SAGD facility.
Full consulting and EPCM services provided for nanofiltration water management and innovative best alternative power option solutions.
Provide a means to repair the existing WAC Neutralization Tank, without requiring plant shutdown during the repair process.
Integrated Sustainability was asked to evaluate source water from a different formation in order to reduce the pressure in this formation. This was done to mitigate risk associated
Investigate solutions to mitigate unexpected solids in the blowdown and regen streams upstream of the disposal wells at a SAGD facility. The investigation required lab analyses of the filter
Latest Projects
Calgary
1600 — 400 3rd Avenue Southwest
Calgary, AB T2P 4H2
Canada
Barbados
Canewood Business Centre, 1st Floor
5 Canewood Industrial Park
St. Michael, Barbados
BB11005
Vancouver
620 — 1050 West Pender Street
Vancouver, BC V6E 3S7
Canada
Houston
11111 Katy Fwy STE 910
Houston, TX 77079-2119
USA
California
300 — 701 Palomar Airport Road,
Carlsbad, California
USA
Land Acknowledgement
We acknowledge that our Vancouver Office is located on the unceded territories of the xʷməθkʷəy̓əm (Musqueam), Sḵwx̱wú7mesh (Squamish), and Sel̓íl̓witulh (Tsleil-Waututh) Nations.
We also acknowledge that our Calgary Office is located in the traditional territories of the Blackfoot Confederacy (Siksika, Kainai, Piikani), the Tsuut’ina, the Îyâxe Nakoda Nations, the Métis Nation (Region 3), and all people who make their homes in the Treaty 7 region of Southern Alberta.
We recognize and thank all these communities for having cared for these lands and waters and are grateful for the opportunity to be on this shared territory.