Produced Water Hub
The client requested that Integrated Sustainability transform an existing borrow pit into a Lined Water Storage Pond/Water Hub in northeast British Columbia. The Pond will be used to store
The client requested that Integrated Sustainability transform an existing borrow pit into a Lined Water Storage Pond/Water Hub in northeast British Columbia. The Pond will be used to store
Repair an old sewer outfall in need of replacement for continued use by the community. A portion of the outfall section to be repaired or replaced lies in sensitive
Latest Projects
Calgary
1600 — 400 3rd Avenue Southwest
Calgary, AB T2P 4H2
Canada
Barbados
Canewood Business Centre, 1st Floor
5 Canewood Industrial Park
St. Michael, Barbados
BB11005
Vancouver
620 — 1050 West Pender Street
Vancouver, BC V6E 3S7
Canada
Houston
11111 Katy Fwy STE 910
Houston, TX 77079-2119
USA
California
300 — 701 Palomar Airport Road,
Carlsbad, California
USA
Land Acknowledgement
We acknowledge that our Vancouver Office is located on the unceded territories of the xʷməθkʷəy̓əm (Musqueam), Sḵwx̱wú7mesh (Squamish), and Sel̓íl̓witulh (Tsleil-Waututh) Nations.
We also acknowledge that our Calgary Office is located in the traditional territories of the Blackfoot Confederacy (Siksika, Kainai, Piikani), the Tsuut’ina, the Îyâxe Nakoda Nations, the Métis Nation (Region 3), and all people who make their homes in the Treaty 7 region of Southern Alberta.
We recognize and thank all these communities for having cared for these lands and waters and are grateful for the opportunity to be on this shared territory.