Stormwater Management Facility Design
Final (Issued for Design) drawings for stormwater management concrete structures, inlet and/or outlet pipe size and material, etc…
Final (Issued for Design) drawings for stormwater management concrete structures, inlet and/or outlet pipe size and material, etc…
Integrated Sustainability was retained to evaluate and confirm that the loads provided by the addition of architectural timber fascia features can be supported by the existing building cladding system
University of the West Indies Open Campus (UWIOC) site study and conceptual design for campus sites in Trinidad, St. Kitts, Dominica, and Belize.
Latest Projects
Calgary
1600 — 400 3rd Avenue Southwest
Calgary, AB T2P 4H2
Canada
Barbados
Canewood Business Centre, 1st Floor
5 Canewood Industrial Park
St. Michael, Barbados
BB11005
Vancouver
620 — 1050 West Pender Street
Vancouver, BC V6E 3S7
Canada
Houston
11111 Katy Fwy STE 910
Houston, TX 77079-2119
USA
California
300 — 701 Palomar Airport Road,
Carlsbad, California
USA
Land Acknowledgement
We acknowledge that our Vancouver Office is located on the unceded territories of the xʷməθkʷəy̓əm (Musqueam), Sḵwx̱wú7mesh (Squamish), and Sel̓íl̓witulh (Tsleil-Waututh) Nations.
We also acknowledge that our Calgary Office is located in the traditional territories of the Blackfoot Confederacy (Siksika, Kainai, Piikani), the Tsuut’ina, the Îyâxe Nakoda Nations, the Métis Nation (Region 3), and all people who make their homes in the Treaty 7 region of Southern Alberta.
We recognize and thank all these communities for having cared for these lands and waters and are grateful for the opportunity to be on this shared territory.