site logo

Project Tag: River or Lake Intake Development

Water Hub & Intake Pipe

Integrated Sustainability was retained to execute the design phase of the client’s Water Hub and Intake Pipeline infrastructure project. The Water Hub and associated infrastructure was required to store

Water Intake Optimization

Evaluate the existing intake infrastructure for regulatory compliance, and provide risk mitigation options for operational changes.