3R’s (Reduce, Reuse and Recycle) for Climate Resilience Wastewater Systems in Barbados
Conceptual design to upgrade the two wastewater treatment facilities in Barbados (the Bridgetown & South Coast Wastewater Treatment Plants)
Conceptual design to upgrade the two wastewater treatment facilities in Barbados (the Bridgetown & South Coast Wastewater Treatment Plants)
Prime contractor for all construction, construction management, procurement, QA/QC, of a 100,000 m3 lined freshwater storage reservoir.
Development of a river water intake (10,000 m3/d), water storage tanks, (5,000 m3/day) treatment facility, and 200,000 m3 saline water storage ponds
Major constituent removal was focused on selenium and metals and was designed to treat water to environmental discharge criteria. The selenium treatment system can perform up to 6,500 m3/day.
Secondary treatment of HDS plant effluent and TMF supernatant to remove dissolved metals (particularly copper), nitrate, and selenium
Treatment of dissolved metals (Cd, Cu, Fe, Zn), as well as ammonia, from several underground sources prior to discharge into the environment.
Design, Build, Finance, and Operation of a dedicated 4,000 m3/d water treatment facility for on-demand water recycle. Provided the design and operation of the facility with guaranteed performance to
Provided the siting, geotechnical investigation, preliminary/detailed engineering, regulatory package, procurement, and construction services required for 2 x 50,000 m3 saline water storage ponds in NE BC. Collected orthorectified imagery
Feasibility level engineering design and cost estimating for a mine water treatment plant.
Major constituents for removal included copper, cadmium, iron, arsenic, and ammonia. Plant designed for peak flows
Developed a water reuse strategy to encourage water reuse to reduce operational costs and maintain the client’s social license to operate.
The client requested that Integrated Sustainability transform an existing borrow pit into a Lined Water Storage Pond/Water Hub in northeast British Columbia. The Pond will be used to store
Site investigation & assessment, detailed reservoir and associated infrastructure design, contractor tender services, and on-site construction management services
Latest Projects
Calgary
1600 — 400 3rd Avenue Southwest
Calgary, AB T2P 4H2
Canada
Barbados
Canewood Business Centre, 1st Floor
5 Canewood Industrial Park
St. Michael, Barbados
BB11005
Vancouver
620 — 1050 West Pender Street
Vancouver, BC V6E 3S7
Canada
Houston
11111 Katy Fwy STE 910
Houston, TX 77079-2119
USA
California
300 — 701 Palomar Airport Road,
Carlsbad, California
USA
Land Acknowledgement
We acknowledge that our Vancouver Office is located on the unceded territories of the xʷməθkʷəy̓əm (Musqueam), Sḵwx̱wú7mesh (Squamish), and Sel̓íl̓witulh (Tsleil-Waututh) Nations.
We also acknowledge that our Calgary Office is located in the traditional territories of the Blackfoot Confederacy (Siksika, Kainai, Piikani), the Tsuut’ina, the Îyâxe Nakoda Nations, the Métis Nation (Region 3), and all people who make their homes in the Treaty 7 region of Southern Alberta.
We recognize and thank all these communities for having cared for these lands and waters and are grateful for the opportunity to be on this shared territory.